Permits to work
Permit conditions and isolation points on hand, ticked off on the device as the crew goes.
Exact isolation steps from your SOPs, read out so hands stay free.
Lockout for pump P-3 at the booster station?
Stop P-3 at the panel, open and lock isolator ISO-3, close valves V-31 and V-32, then verify zero energy.
How do I verify zero energy?
Try to start P-3 from the local panel, check the pressure gauge reads zero, then confirm on the checklist.
Can two people share one lock?
No. Each person fits their own lock and tag, per section 3 of the procedure.
Every machine has its own isolation points, and procedures are kept in binders or systems far from the equipment. Technicians work from memory under time pressure. A missed isolation point can injure someone.
Maintenance technicians isolating equipment at plants, stations and substations.
Isolation points and sequences for each piece of equipment.
The technician hears each step and confirms it before the next.
Revised procedures reach every device over the air.
Answers come from the device, so substations, lines and pipelines without coverage make no difference.
The technician follows your procedure, not their memory.
Steps are read aloud while the technician works.
No. It reads your procedure and always defers to it.
It says so and tells the technician to follow the site supervisor’s instructions.
Yes. Confirmed steps are logged and synced.
Pick one team and one use case. We’ll have it running on your own devices in weeks.
Ask ChatGPT, Claude or Perplexity and see what they think. One click, instant insight.