01Substation switching
Switching sequences and interlocks from your own procedures, inside sites with no coverage.
“Switching order to take transformer T2 out of service?”
Follow switching programme SP-12: open CB-204, then isolator 204-1, then confirm on the panel. Steps 4 to 9 cover earthing.
Example answer