Camera inspection at line speed
A vision model on the gateway checks every part and flags defects without sending images out of the plant.
Inspectors check what to do with a part that’s outside tolerance, from your quality procedures.
The bore is 12.03 mm. Can I release it?
No. It’s 0.01 mm over the limit. Tag it red and log it for the quality engineer, per procedure QP-4.
Can this part be reworked?
Yes. Oversize bores can be sleeved under rework instruction RW-12, with engineer approval.
Who approves rework on night shift?
The on-call quality engineer listed on the shift board. Hold the part until they approve.
When a measurement is close to a limit, the decision to release, rework or scrap must follow procedure. Inspectors on night shifts often have no engineer to ask. Inconsistent decisions create escapes to customers or unnecessary scrap.
Inspectors and operators at measurement stations and in the quality lab.
Tolerances, disposition rules and escalation steps for each part.
The inspector enters the measurement and gets the rule that applies and the next step.
Drawing and procedure changes reach the tablets in the next update.
Every shift applies the same rule.
No waiting for an engineer on simple cases.
Borderline cases go to the right person.
No. It applies your written rule and tells the inspector the next step. People approve rework and concessions.
It says there is no rule and tells the inspector to hold the part and escalate.
With your quality system connected as a tool, it can prepare the record for the inspector to submit.
Pick one team and one use case. We’ll have it running on your own devices in weeks.
Ask ChatGPT, Claude or Perplexity and see what they think. One click, instant insight.